THE EFFECTS OF TOTAL QUALITY MANAGEMENT ON PRODUCTIVITY USING THE PROBIT MODEL (A CASE STUDY OF SKYE BANK PLC EDO STATE)

3,000.00

Category:

Description

ABSTRACT

The broad objective of this research work is to take a critical look at the principle of total quality management so as to find out how its implementation will affect an organisation‟s productivity and profitability. For the purpose of this study, the researcher limited its data to those of the Skye Bank Plc and her customers. The researcher used survey method to investigate the effects of Total Quality Management on productivity using the probit model: a case study of Skye Bank Plc Edo State.

TABLE OF CONTENTS

Approval Page
Certification Dedication Acknowledgement Abstract

CHAPTER ONE:

INTRODUCTION

1.1 Background of the study
Statement of the problem

Statement of the objectives

Research questions

Hypotheses of the study

Significance of the study

Scope of the study

Limitations of the study

CHAPTER TWO

LITERATURE REVIEW

Introduction

Review of relevant literature on T.Q.M

T.Q.M overview

The importance of people in T.Q.M

Quality measurement and business excellence

Quality improvement verses quality assurance

Implementation of principles

Steps in managing the transition

Key improvement concepts

Process and systems

Customers and suppliers

Quality

Benchmarking

Teams and teamwork

The concept of continuous improvement by T.Q.M

Basic principles of T.Q.M

Key element of T.Q.M

Steps to total quality management (T.Q.M)

The concepts of culture

Applying T.Q.M in T.Q.M in academics

The success of T.Q.M

Measurement of organizational CHAPTER THREE METHODOLOGY
Research design

Source of data

Area of study

Population of the study 38

Determination of sample size

Reliability test

Validity test

Techniques for data analysis CHAPTER FOUR PRESENTATION OF DATA
Presentation of data

Test of hypotheses

Discussions of findings

CHAPTER FIVE

SUMMARY, CONCLUSION, RECOMMENDATION

SUMMARY

CONCLUSION

RECOMMENDATION Bibliography
Appendix

CHAPTER ONE

INTRODUCTION

HISTORICAL BACKGROUND AND THE ORIGIN OF SKYE BANK PLC
Banking in Nigeria took a new dimension after the pronouncement of the former governor of the Central Bank of Nigeria professor Charles Soludo for the need to improve the banking industry in Nigeria thereby competing with other foreign banks, hence capital base to 25 billion naira.
According to the governor of central bank professor Charles Soludo, the whole idea of the increment is to give room for other small financial institutions to strive, thereby reducing the rate of competition amongst banks in Nigeria.
For the purpose of this study, Skye Bank PLC came together as an entity after due diligence was carried out amongst their five banks.
Prudent Bank

EIB Eko International Bank

Reliance Bank

Bond Bank

Cooperative Bank Ltd

Currently, the bank has a significant network spread across the nation over 200 branches and also planning to spread across West African countries, turn up before the end of 2007, it major of business is centered round services, hence service delivery is term of Skye Bank or the hallmark as it term.
As a new generation bank, Skye Bank Plc is online real that is to say every customer can access his/her account from any of location whether it is savings or current account. It is worthy to know that the bank is highly aggressive in expanding its numerous clientele world, that is to say that the satisfaction derived by the customers is a key.
As a strategy to preposition the industry in order to offer high quality products, CBN embarked upon a process of scrutinizing products offered by banks.
Quality management of products in a post consolidation era been brought to front banner. In order to contribute to this debate, TQM (total quality management) as a policy for assessing and

regulating service delivery process became a very important instrument in this regard.
At the heart of the survival of any bank the satisfaction of the clients is most important, the clients/customers are only satisfied when their demands are being met at the right cost and to the right quality. Ironically, it only when the customers are satisfied that the bank in question can be seen as performing it as a new generation bank.
One particular approach to improve organizational performance and effectiveness is the concept of the Japanese-inspired Total Quality Management. This is a set of management practices throughout the organization, geared to ensure the organization consistently meets or exceeds customer requirements. TQM places strong focus on process measurement.
The successful organization should as a matter of policy be constantly seeking opportunities to improve the quality of its products or services and processes; the bank must also couple quality with a required level of productivity. TQM represents a total system and as such increasingly enhances quality circles as a broader means of addressing the demand for quality.

Total Quality Management is a method by which management and employees can become involved in the continuous improvements of their products and services. It is a combination of quality and management tools aimed at increasing profit and reducing losses due to wasteful practice.
This research work stems from the need to evaluate the cost of quality vis-à-vis its benefits in terms of increased productivity of any organization, a lot of banks pay lip service to quality simply because they do not realize the benefit such investment of time, effort and money will bring to their banking system other are skeptical on whether or not there is any real benefit at all.
It was the need to clear all these and show through a detail and systematic study of how a popular quality philosophy such as TQM will affect the performance of Skye Bank PLC that forms that background for the study.
STATEMENT OF THE PROBLEM

The central focus of gravity organization is customer satisfaction and improved performance. Quality focus seeks to institutionalize planned and continuous improvement so as to ensure that quality is the outcome of all activities that takes place within an organization; that all

functions and all employees have to participate in the improvement process; that organization need both quality culture and management effectiveness of this approach in making small but steady improvements. But users and critics of Total Quality Management universally agree that that approach takes too long to do, many abandon the approach with frustration because it takes too long.
If we were to break a Total Quality Management efforts into its components, it takes more time, very little go into problem solving.
Perhaps, we should spend more time on identifying the right problem. After all, solving the wrong problem is a complete waste of time, in this section we shall strictly discuss the basic problems encountered in TQM implementation which was addressed by this research work.
One nagging and ever present problem with Total Quality Management is meetings and more meetings; lots of time goes into meetings. Thus anything that will make meetings effective will reduce the amount of time spent on the Total Quality Management and then makes it worth the while.
Another problem with Total Quality Management implementation is the fact that a great deal of time is spent on charting

a process. Steam members debate how the current process works. In essence, by describing the process, teams set the stage for how the process could be changed. Description of the process creates the mind set and frame within which solutions would be sought.
Discovering ways to radically reduce the time it takes to do a process charts will go a long way in helping to solve the problem.
Still another problem is that and effort is spent in data collection, once an improvement is made we need to collect data to verify that indeed real improvement have been made. This phase takes considerable amount of time, as designed surveys distributed, retrieved and analyzed, several months to a few years may be spent on data collection. Again effort need to be put on strategies to reduce the amount of time and effort spent on this area.